Quality
Checked before it is packed, documented before it is shipped
A cable is only as good as what arrives on site. Our quality process covers the drawing approval, the routine tests on the finished cable, the marking and the export packing.
Management systems
Produced under auditable systems
Orders are produced under management systems that cover quality, environment, safety and measurement.
- ISO 9001 — Quality management
- ISO 14001 — Environmental management
- ISO 45001 — Occupational health & safety
- ISO 50001 — Energy management
- ISO 10012 — Measurement management
- GB/T 36132 — Green factory
- GB/T 29490 — Intellectual property
- GB/T 27922 — After-sales service
Inspection
Four checkpoints on every order
-
1
Before production
Drawing and specification approval, conductor and compound confirmation, and a check that site conditions match the selection.
-
2
During production
Conductor dimensions, insulation thickness, sheath thickness and profile width are checked against the approved drawing.
-
3
On the finished cable
Conductor resistance, voltage test, insulation resistance, appearance, marking and length. Test data is issued with the shipment.
-
4
Before shipment
Drum and coil packing inspected, ends sealed, markings and labels verified against your instruction.
Protection
Rated for the places cables actually go
- IP68 joints and terminations for buried and wet locations
- 105 °C maximum conductor operating temperature
- Flame-retardant and fire-resistant sheath options
- Full insulation and sheath coverage with no induced voltage on the outer surface
Documents with the shipment
- Commercial invoice and packing list
- Test report for conductor resistance, voltage and insulation
- Certificate of origin (Form A, Form E or as required)
- Packing list with drum numbers, lengths and net / gross weights
- Bill of lading handling through your forwarder or ours
Packing
On the drum, banded, and documented
Each run leaves on its own drum with the test data and the packing list attached, so the site receives one length instead of a set of joints.
Certificates and test reports
Certificates and third-party test reports for a specific order are provided on request. Tell us which document your project requires and we will confirm availability before the order is placed.
Ask about a documentSend us the load and the route
Tell us the current, voltage, route length and laying method. You will have a specification, a drawing and a price within one working day.